
We work directly with structural engineers, coordinate with Logan City Council inspectors, and use specialized equipment to handle everything from rock-hard clay to waterlogged sites. Every footing we install comes with our 10-year structural warranty because we know they’re built to handle whatever Logan’s weather and soils throw at them.
That homeowner in Yarrabilba? We dug their footings 200mm deeper than the original contractor, added proper drainage, and used 32MPa concrete instead of the standard 25MPa. Five years later, their house is still sitting perfectly level while their neighbor – who went with the cheapest quote – is dealing with cracks in their walls.

Technical Excellence in Logan Concrete Footings
Getting the Depth Right Every Time
Logan’s soil classifications aren’t suggestions – they’re requirements. Class S soils need minimum 450mm depth, but most of Logan’s got Class M and Class H reactive clays that require 600mm or deeper. We’ve got soil charts for every suburb from Browns Plains to Mundoolun, and we know which areas need that extra depth to handle seasonal movement.
Concrete Strength That Lasts
Standard 25MPa concrete works fine for basic residential footings, but we often recommend 32MPa for commercial applications or challenging soil conditions. When you’re dealing with Logan’s reactive clays, that extra strength makes the difference between footings that last decades and ones that crack in the first few years.
Reinforcement Systems Done Right
Every footing gets proper steel reinforcement – minimum N12 bars positioned exactly where the structural engineer specifies. We’ve seen too many footings fail because someone skimped on the steel or didn’t maintain proper cover. Our reinforcement meets Australian Standards AS 3600, and we’ve got the test certificates to prove it.
Drainage Protection Systems
Logan’s wet seasons can dump serious water around your footings. That’s why we install agricultural drainage pipe and gravel protection systems that direct water away from your foundations. Poor drainage kills more footings in Logan than just about anything else, but it’s completely preventable when you do it right.
Quality Control at Every Step
We test every concrete pour – slump tests to make sure the mix is right, and strength testing to verify it meets specifications. Our excavations get inspected before we pour, our steel placement gets checked, and everything gets documented for council inspections. No guesswork, no shortcuts.
Local Knowledge, Local Results
At Concrete Logan Experts, we know Logan’s ground conditions aren’t the same as Brisbane or the Gold Coast. Our team has worked with Logan’s reactive clay soils, steep blocks, and heavy summer rainfall for years. This local knowledge allows us to design and pour footings that hold strong, even when the weather or soil shifts. Whether it’s a new home, extension, or commercial build, we know what it takes to get it right the first time.
Built to Last with Quality Standards
Every footing we pour meets Australian Standard AS 3600, but we don’t stop there. We use high-grade reinforcement, premium concrete mixes, and proven techniques to deliver footings that resist cracking, movement, and premature wear.
Our focus is on strength and durability, ensuring your structure stands on a foundation designed to last decades, not just years.
Reliable Service from Start to Finish
From the first site inspection and soil testing through to excavation, pouring, and curing, we take care of the entire process. Our team provides clear communication at every step, realistic timelines, and a clean finish once the job’s done.
Builders, homeowners, and developers across Logan choose us because we combine technical expertise with reliable, down-to-earth service—backed by work that adds genuine value to your property.
We provide comprehensive house slab construction for every type of home being built in Logan. Whether you’re working with volume builders on project homes or creating custom architectural designs, our slab systems deliver the structural integrity your project demands.

1. Initial Site Assessment and Planning: Before we dig the first hole, we survey your site, assess soil conditions, and review all engineering drawings. We coordinate with Dial Before You Dig, mark all utility locations, and establish proper levels and grades.
2. Engineering Coordination and Permits: We work directly with your structural engineer to clarify any specifications and coordinate with Logan City Council for required inspections. Our established relationships with council inspectors mean faster approvals and smoother project flow.
3. Precision Excavation and Preparation: Our excavation crews know Logan’s soils and use the right equipment for each job. Rock breakers for hard clay, mini excavators for tight access, and proper shoring when required.

4. Steel Placement and Concrete Installation
Reinforcement steel gets positioned exactly per engineering specifications with proper cover and overlap. We use only certified concrete suppliers and test every pour for strength and consistency. Proper finishing prepares the footing surface for wall construction.
5. Final Inspections and Documentation
Council inspections, engineer sign-offs, and complete documentation for your building certification. We coordinate all required inspections and provide complete records for your building file. Everything done right, everything documented properly.
Ready to Start Your Logan Footing Project?
Every footing project starts with understanding your site conditions, soil type, and structural requirements. We’ll assess your property, review any engineering drawings, and provide detailed recommendations for your specific situation. No obligation, no pressure – just professional advice from Logan’s footing specialists.
Don’t let poor footings compromise your building project. Logan’s challenging soils require experienced contractors who understand local conditions and use proper construction methods. Contact us today to discuss your concrete footings needs and get your project started on the right foundation.
FAQs About Concrete Footings in Logan
How deep should concrete footings be in Logan?
Footing depth depends on soil type and load requirements. In Logan, most properties have reactive clay soils that require 600mm–750mm depth, compared to 450mm for stable soils. We assess each site individually to ensure proper stability.
Do I need council approval for footings?
Yes. Most concrete footings in Logan require building permits and structural engineering drawings to comply with Logan City Council standards. Our team handles the approvals and coordinates with engineers for a smooth process.
How long does it take to install footings?
Typical residential footings take 2–3 days, depending on weather and site conditions. Larger or commercial projects may take longer, but we provide clear timelines upfront and keep you updated.
What causes concrete footings to crack in Logan?
Cracking usually happens when footings aren’t built for Logan’s reactive clay soils—for example, if they’re too shallow, lack reinforcement, or don’t have proper drainage. With correct design and installation, cracking can be avoided.
Can you connect new footings to existing ones?
Yes. We use engineering-approved connection methods like mechanical anchors or chemical bonding systems to integrate new footings with existing structures, ensuring stability and preventing movement.

